How long does a helpdesk migration take?

Most of a helpdesk migration’s calendar time is preparation: taking stock, mapping fields and values, and checking a sample. The run itself is paced by the API allowance of the two platforms and by how many API calls each record needs, and with a delta run at cut-over the actual switch is short whatever the volume.

By the DataGrine team · Updated · 3 min read

Key takeaways

  • The mapping and the sign-off usually take longer than the migration run.
  • The slower of the two platforms’ API allowances sets the pace of the run.
  • Integrations on the old helpdesk share its API allowance with the migration.
  • A delta run at cut-over keeps the switch short, so the full run can take as long as it needs.

What sets the pace: API allowances

Every helpdesk limits how many API requests an account can make in a period, and every integration connected to the account shares that allowance. A migration can only go as fast as the slower of the two platforms allows.

  • Freshdesk sets its limit per minute by plan, and applies it to the whole account.
  • Intercom’s default limit is much higher and is spread over ten-second windows, so writing into Intercom is rarely what sets the pace.
  • Zendesk’s Ticket Import API accepts up to 100 tickets per bulk request.

A ticket is also several requests, not one: the record, each reply, its attachments, and often its assignment and state. Attachments add transfer time on top.

How to make a migration faster

  • Decide the mapping quickly. Waiting on a decision costs more days than any rate limit.
  • Pause heavy integrations on the old helpdesk during the full run.
  • Trim the scope: a date range, no spam, no deleted tickets.
  • Start the full run early. With a delta run at cut-over, it does not have to finish the night before.

DataGrine migrations can be run self-serve on the platform or fully managed by the migration team, with 24/7 support either way; in both, a delta sync at cut-over keeps the switch short. See how a migration runs.

Questions

Asked about this, often.

Can a helpdesk migration be done over a weekend?

The cut-over can. The full run happens beforehand while the team keeps working, so the weekend only has to carry the delta run and the channel switch.

Does a bigger account always take longer?

The full run does, roughly in proportion to records and API calls. The cut-over does not: a delta run only carries what changed since the full run.

Does the support team have to stop working during the migration?

No. The team keeps working in the old helpdesk during the full run, and the delta run at cut-over carries what changed in the meantime.

Let’s move your data forward.

Tell us where you are moving from and to. Run it yourself on the DataGrine platform or let our migration team handle it end to end, with 24/7 support either way.

  • A written mapping document before anything moves
  • A sample migration you review before the live run
  • Delta sync at cut-over and rollback per run
  • 24/7 premium support until you sign off